First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • doggle@lemmy.world
    link
    fedilink
    English
    arrow-up
    0
    ·
    1 年前

    Oh, neat. My state did something not completely stupid. I’ve got some reservations about nuke power as opposed to renewable, but this is definitely better than continuing fossil fuels.

    • killa44@lemmy.world
      link
      fedilink
      English
      arrow-up
      0
      ·
      1 年前

      Fission and fusion reactors are really more like in-between renewable and non-renewable. Sure, it relies on materials that are finite, but there is way, way more of that material available in comparison to how much we need.

      Making this distinction is necessary to un-spook people who have gone along with the panic induced by bad media and lazy engineering of the past.

        • Ryumast3r@lemmy.world
          link
          fedilink
          English
          arrow-up
          0
          ·
          1 年前

          I’m spooked by the fact that you have no idea how the US enriches uranium, or the difference between a power pressurized water reactor and a fast “breeder” reactor (if you were thinking of plutonium) or a centrifuge.

          The US enriches uranium using a gas-centrifuge. The US also no longer recycles spent nuclear fuel, but France does.